Insights

Global surgery modifiers in orthopedic billing

Orthopedic practices see patients constantly during global periods. Every visit and procedure in that window is either part of the surgical fee or separately billable, and the modifier is what tells the payer which.

What the global surgical period is

Surgical procedures are paid as a package. The surgical fee covers the procedure plus related care before and after it, for a set number of days. Medicare assigns each procedure a global period:

  • 0 days: minor procedures such as many injections and endoscopies. Only the day of the procedure is included.
  • 10 days: minor procedures. The day of the procedure and the 10 days after it are included.
  • 90 days: major procedures such as fracture repairs and joint replacements. The day before, the day of, and the 90 days after are included.

Most commercial payers follow Medicare’s global periods, though some set their own. The Medicare physician fee schedule lists the period for each code.

What’s included in the global package

  • Pre-operative visits after the decision for surgery, starting the day before a major procedure.
  • The procedure itself, including local anesthesia and the usual supplies.
  • Routine post-operative visits, dressing changes, suture and staple removal, and cast changes related to the surgery.
  • Treatment of complications that don’t require a return to the operating room.

Post-op visits for the surgery are reported with CPT 99024 so the practice can track them, but they aren’t paid separately.

The modifiers that unlock separate payment

Modifier 57: decision for surgery

Use on the E/M visit, the day before or the day of a major procedure, when that visit is where the decision to operate was made. Without it, the visit is considered part of the global package and won’t be paid.

Modifier 25: significant, separate E/M on the day of a minor procedure

For procedures with a 0- or 10-day global period, the E/M work to decide on the procedure is usually included. Modifier 25 applies when the visit goes beyond that, such as evaluating a separate problem or a full workup of a new injury. Our guide to modifier 25 and 59 covers the documentation in detail.

Modifier 24: unrelated E/M during the post-op period

Use on an E/M visit during the global period for a problem unrelated to the surgery. A patient seen for a new shoulder injury 30 days after a knee replacement is a typical case. The diagnosis code should clearly show the unrelated condition.

Modifier 58: staged or planned procedure

Use when a second procedure during the global period was planned at the time of the first, is more extensive than the first, or is therapy after a diagnostic procedure. A new global period starts with the second procedure.

Modifier 78: unplanned return to the operating room

Use when a complication requires a return to the operating room during the global period. Medicare pays only the intraoperative portion, and no new global period begins. Complications treated in the office or at the bedside, without a return to the OR, are part of the original global package.

Modifier 79: unrelated procedure during the post-op period

Use for a procedure during the global period that’s unrelated to the original surgery, such as a procedure on the other knee. A new global period starts for the new procedure.

The orthopedic scenarios that cause the most denials

  • Decision visit billed without 57 the day before a fracture repair or joint replacement.
  • Unrelated post-op visit without 24, or with 24 but a diagnosis code that looks related to the surgery.
  • Return to the OR billed with 79 instead of 78, or a related complication billed as unrelated.
  • Fracture care billed alongside the global code for the same fracture. Closed fracture treatment codes include the cast and follow-up care.
  • Another surgeon in the same group billing a post-op visit. The global package applies to the group, not just the operating surgeon, when they share a specialty and tax ID.

Splitting the global package between providers

When one surgeon operates and another provider handles the post-op care, the package can be split. Modifier 54 marks surgical care only, 55 post-operative care only, and 56 pre-operative care only. Both providers bill the same procedure code with their modifier, and they need a documented agreement on the transfer of care.

Documentation that supports each modifier

The note has to support the modifier on its own. A decision for surgery should say the decision was made at that visit. An unrelated visit should show a different problem and a different diagnosis. A return to the OR should describe the complication and why it needed the OR.

Our orthopedic billing page covers how we handle surgical coding, global periods, DME and authorizations for orthopedic practices. If global period denials are piling up, ask for a free A/R audit.

Common questions

What is the difference between modifier 78 and 79?

Modifier 78 is an unplanned return to the operating room for a complication of the original surgery, with no new global period. Modifier 79 is a procedure unrelated to the original surgery, and it starts its own global period.

When do you use modifier 57 instead of 25?

Modifier 57 is for the visit where the decision is made for a major surgery with a 90-day global period. Modifier 25 is for a significant, separate E/M service on the same day as a minor procedure.

Are post-op visits billed during the global period?

Routine post-op visits are included in the surgical fee. They are reported with 99024 for tracking but are not paid separately.

Start with the free audit

Send us ninety days of claims data and we’ll show you what was left uncollected. No charge, no obligation, and the findings are yours either way.

Request my free audit